Plastic factory dedicated central feeding system

日期:2025-04-03 05:21
瀏覽次數(shù):419
摘要:Plastic factory dedicated central feeding system Is designed for the injection molding plant plastic products, to achieve a continuous uninterrupted continuous delivery. Continued forming operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve coloring process Of automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the
Plastic factory dedicated central feeding system
Is designed for the injection molding plant plastic products, to achieve a continuous uninterrupted continuous delivery.

Continued forming operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve coloring process
Of automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the occurrence of congestion in the storage bin, and to achieve full automation by setting the central control station.
 Plastic factory dedicated centralized supply of a machine with a tube, sealed circuit design, to ensure the stability of the entire system, no plastic resurgence, blocking material phenomenon occurred. It is used in conjunction with a central dryer system to allow dry air to dry the raw material again, to prevent the resurfacing of the plastic after drying, and to clean the duct after each conveyance cycle to ensure that there is no residue in the pipe. In order to avoid the return of raw materials at the same time also ensure that the injection molding machine in the consistency of raw materials in the vacuum negative pressure with the role of the original raw materials in the dust filter system filter out, favorable to improve product quality.
 Plastic factory dedicated central feeding system using computer centralized automatic control, to achieve the pellet 24 hours continuous feeding operations. More than a small computer to control the molding machine of each molding process, accurate measurement, mixed evenly, and flexible to change the color, to adapt to the multi-color products and more requirements. According to the production of different molding machine, the flexibility to change the amount of feed. Multiple feed pipe design, can guarantee the requirements of the diversification of the main material. The system has a variety of monitoring and protection functions, safe and reliable work. Plastic factory dedicated central feeding system alias: centralized feeding system, automatic feeding system.

D & A company design plastic factory dedicated central feeding system for automatic injection extrusion special equipment
Using a "one machine a tube" design, to ensure that the entire system of air to transport raw materials to prevent dehumidification after drying raw materials resurgence. At the same time in each transport line is stable, no blocking material phenomenon occurred. It is used with the central dehumidification drying system,

You can use the dehumidification drying cycle will be sent to clean the pipeline to ensure that there is no residual pellet in the pipeline,

In order to avoid the return of raw materials at the same time, but also to ensure that the injection molding machine to join the performance of raw materials consistent. In the vacuum under the action of raw materials in the original dust will be filtered through the dust filter system, help to improve the quality of molding products.

Plastic factory dedicated central feeding system has the following characteristics:

Efficient automatic injection molding Central feeding system can be achieved by a variety of raw materials automatically supply to the multi-chamber arbitrary injection molding equipment used, which may include raw materials, drying, color processing,

As well as the proportion of the use of crushed recycled materials, to carry out a high degree of automation control, monitoring, etc., and to meet the 24-hour non-stop production needs.
 
Plastic factory dedicated central feeding system energy-saving operation is simple, only a few people can control the entire injection molding plant demand for the plant, thereby reducing the large number of labor costs. Second, the reduction in the injection molding machine next to the raw material and the corresponding auxiliary equipment, improve the utilization of space.

In addition, due to the use of the central way of supply, corresponding to reduce a lot of stand-alone equipment, also saves energy and reduce maintenance costs.
Personalized plastic factory dedicated central feeding system can be used to different users, different workshop characteristics, different requirements for the use of raw materials. Can be designed according to the actual needs of the optimal solution.


Plastic factory dedicated central feeding system modern factory image: the raw materials and dust will be on the injection molding production to minimize the level of pollution, which can maintain a clean production workshop, and the Aet Thai plastic factory dedicated centralized feeding system

Unique concentration of dust recovery system, clean more convenient, environmental protection effect is to reach 100,000 clean room operating requirements standards, and reduce noise, and ultimately can achieve unmanned automated production workshop, and establish a modern factory management image.
Plastic factory dedicated central feeding system to improve services: D & A company within the highly efficient and highly skilled construction team to ensure that the construction schedule and the overall project and the original injection workshop
1, from the plant planning, hydropower engineering design, clean room engineering design, technical advice, to the whole plant process planning, by the

People to provide you with the most complete and most professional design and planning.
2. To provide you with the highest quality, high value of the product. Our products are readily available, from dehumidification dryer to automatic metering mixer, hopper dryer, automatic vacuum filling machine, freezer, everything. Quality is definitely worth your trust.
3. By professional engineers for your construction, installation, to complete the test after the delivery, a series of professional services, and provide the necessary education and training and technical guidance.
4. Perfect after-sales service, engineers personally to the factory maintenance, so you completely worry-free. Operating status LED display panel: according to the machine display design, understand the location of the machine, whether it is monitoring



  Plastic factory dedicated central feeding system using computer centralized automatic control, to achieve the pellet 24 hours continuous feeding operations. More than a small computer to control the molding machine of each molding process, accurate measurement, mixed evenly, and flexible to change the color, to adapt to the multi-color products and more requirements. According to the production of different molding machine, the flexibility to change the amount of feed. Multiple feed pipe design, can guarantee the requirements of the diversification of the main material. The system has a variety of monitoring and protection functions, safe and reliable work.

 Plastic factory dedicated central feed for the injection molding plant is the design of plastic products, to achieve a continuous unmanned continuous molding operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve the color process automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the occurrence of congestion in the storage bin, and to achieve full automation by setting the central control station.

(Feeding system, central feeding system, large dehumidification system, color mixing system, spices, automatic unpacking station)
Above is the introduction of the central feeding system, welcomed the new and old customers to customize the plastic factory dedicated central feeding

粵公網(wǎng)安備 44190002002288號

亚洲精品乱码久久久久久蜜桃麻豆 | 成人午夜免费视频 | 国产精品99久久久久久www | 国产高清一级毛片在线不卡 | 国产精品久久久久久无码人妻 | 特级西西444WWW大精品视频 | 亚洲一区二区视频在线播放 | 91麻豆产精品久久久久久夏晴子 | 亚洲AV无码一区二区三区网址 | 国产一级特黄aaa大片 | 亚洲精品区一区二区三区水户香奈 | 久久99嫩草熟妇人妻蜜臀 | 成人国产精品秘 试看120秒 | 西西44rtwww国产精品 | 国产仙踪林XXX乱码 亚洲AV无码永久精品 | 性一交一乱一美A片麻豆网站 | 17c国产精品一区二区 | 无码GOGO大胆啪啪艺术直播 | 亚洲精品乱码久久久久久蜜桃麻豆 | 欧美性受XXXX黑人XYX性爽 | 无码视频一区二区 | 真人无码一级毛片无遮挡免费 | 亚洲无 码A片在线观看麻豆 | 国产3p露脸普通话对白 | 精品少妇无码AV无码专区完费 | 五十路老熟女 码一区二区 | 西西4444WWW无码精品 | 国产伦精品一区二区三区视频金莲 | 美女极品嫩苞无套内谢 | 国产一级a一级a免费视频 | 真人做爰A片免费观看茄子视频 | 成人动漫一区二区 | 窝人体色77777野大粗 | 熟妇槡BBBB槡BBBB图 | 日产国产亚洲A片无 码 | 国产精品成人电影 | 四川女人毛多水多A片 | 蜜桃臀少妇一区二区三区免费播放 | 精品秘 一区二三区免费雷安 | 无码人妻丰满熟妇区毛片视频 | 肉欲性毛片交国产 |